Design by Ginger Designs · Photos by B Park Media

We finished this basement in Spokane for repeat clients in 2026. It's now a full living space with a wet bar kitchenette, a living area, a bedroom and a primary bath.

The wet bar is the first thing you see. We ran dark Dekton on the counters and up the arched backsplash behind the sink, and set it off with brass fixtures and dark cabinets. There's a range, a dishwasher, a full-size fridge and open shelves, so it works as a real kitchen.

The primary bath has a scalloped oak vanity with a sit-down makeup counter, arched mirrors and brass sconces. There's a freestanding tub and a glass walk-in shower. The brass carries through the whole room, from the shower handle to the tub filler.

Scope

  • Full basement finish: living area, bedroom and primary bath
  • Wet bar kitchenette with dark cabinets, open shelves, range, dishwasher and fridge
  • Arched dark Dekton backsplash and Dekton counters
  • Brass faucets, pulls and fixtures
  • Scalloped oak vanity with makeup counter, arched mirrors and sconces
  • Freestanding tub with a floor-mount brass filler
  • Glass walk-in shower with tile niches
  • Recessed lighting and plank flooring throughout
  • Finished in 2026
Before and after

Before and after

The basement before the finish: bare concrete floor, exposed joists and insulated walls in the open area that is now the living room, kitchen and baths
Before · The bare basement, December 2025. The baths, kitchen and living room are here now.
Basement living area with plank floors, recessed lights, a dining nook and a doorway through to the bedroom
After · The living area
Unfinished basement wall with framing, a small window and plumbing stubbed in, with a trench cut in the floor for new drain lines
Before · The bath wall with plumbing roughed in, March 2026
Oak double vanity with a sit-down makeup counter, arched brass mirrors and brass sconces
After · The primary bath vanity

During the build

Basement during the build, with new wall framing and insulation on the concrete walls
Framing starts, December 2025
Basement with the concrete floor removed down to dirt and plastic sheeting on the walls
Slab out, February 2026
Basement with new interior walls framed on a fresh concrete floor
New walls on the new floor, March 2026

Finished photos by B Park Media.